Note: Below VC 6,No Canister Seal number & no Return Verification initialed or time by Election Officer. Extra Seal Number On Bottom of Page.

Note: Below VC 2, no two Signature of Inspector/Pollworker (Upon Receipt); Two Signatures Required.

Note: Below VC 4, no Canister Seal number & no Return Verification initialed or time by Election Officer

Note: Below VC 7, Two Canister Seal number given & no Return Verification initialed or time by Election Officer for the TSX and paper  canister.

Below VC 8 Mater Seal Certification Log

Irregularities for 2012 Presidential Primary Election

Note: Below the Memory card seal to voting machine "just came off" and was replace right before the polls opened to the voters. Consequential this was the place that Supervisor Pyle won by just a handful of votes. Was this election rigged?


Note: Below VC 8, paper canister seal number 0480275 broken; this would be considered suspicious activity and  should be reported to the Districts Attorneys, per County Clerk Bustamante's "Physcial Security Plan".

Note: Below 2nd page of VC 2, only One Signature of Inspector/Pollworker (Upon Receipt); Two Signatures Required. No Return Verification (Initial & Time).

Irregularities on June 7, 2016 Presidential Primary Election

A Master Seal Certification log is used in transport that records all of the security seals on voting machines and paper ballot canisters to help ensure that votes are not tampered with. The seal is stamped with numbers and attached to the opening of the container in such a way that it cannot be opened without destroying the seal. The seal log records the numbers on the seal at the point of origin (Election Office) and is used to confirm that the seal has not been broken and the voting machines and paper ballot canister has remained closed when it reaches its destination.

Does County Clerk follow the Physical Security Plan?

Note: Below VC 1, no canister seal number recorded & no return verification on Master Seal Certification Log was initialed or time recorded by Election Office for the TSX Tablet & Paper Canister

Note: Below VC 5, no Second Sheet Provided for VC 5.